Wednesday, May 21, 2008

Accomplishments & Troubles

Installing bamboo floors...

... in the guest quarters...

... in the small dome.

Accomplished.

Taping the curves...

... of the stairwell

The plumbing in the master bathroom

Sometimes is pretty tight.

Finally I figured out how I want the kitchen arranged.

Disaster! One of the valves sprung a leak.

Water was leaking for two days!

Previously we had problems with the floor mats sticking to the concrete, now everything was wet and loose.

So we took the opportunity to experiment with different glues.

We decided urethane glue was sufficient.

Pieter spreading the glue in the garage.

Dogwood.




Sunday, March 23, 2008

More stuff

Time for sheetrock on the upper floor, interior walls

...
...

Toilet in the vestibule

Nice pattern

On the walls

This sketch is for the master bathroom

The glass blocks for the shower.

We are living in the clouds!

Friday, February 22, 2008

Bunch of stuff

The bathroom in the small dome

First the "Ditra"
.
Then the tiles
.
And the fixtures
.
Ready to use
.
Pieter is studying the stairs manual for the small dome
.
Phallus magnificus
.
The propellers
.
Looking great
.
Crystal bush

Wednesday, January 30, 2008

More sheetrock

Kitchen layout this way...

...or that way?

the rest of the insulation and sheetrock

cupola ceiling

...

...

...almost...

almost...

DONE!!!!

we have hot water!

...


entrance in the small dome

nice and cozy

this one is for my sister Ela, because she misses the snow

Tuesday, January 15, 2008

Insulating the big dome

All that insulation has to go on the wall/ceiling (?)

Going well (sorry for the orbs, some times they show up)

Above the second floor

...

little by little...

...by little...

Pieter admires his work

...

...

...

...

...

almost done