Tuesday, September 16, 2008

Slow progress

Pieter slaving over the tiles in the downstairs bathroom

Due to the curved nature of the walls we had to find a tile pattern that will cover the straight line distortions

a little grout and the shower will be done

...

we have a little bit of space in the notch of the wall...

... for this beautiful bath faucet

This is the shower in the upstairs bathroom

The picture does not do justice to the tiles

The door for the shower came slightly damaged

Emergency generator and gas tank installed

Culvert and ...

the water overflow, done

The driveway is fixed and covered with fresh stones so we do not have to step in the mud every time it rains

...

...

Worked to the bone!